
Prefab homes for hotels
-
$100K+
average initial investment per project -
3–7 years
payback
CAPEX is fixed at the outset.
ROI in 3–7 years.
- No surprisesFixed price per m²The amount is agreed before production begins and included in the contract.
- vs traditional constructionCAPEX 20–40% lowerCompared with traditional construction. The technology eliminates typical sources of cost overruns.
- TransparencyThe budget is part of project documentationA complete estimate before the contract is signed, not after work starts.
Payment schedule under the contract:
10%
advance payment under the contract80%
before production begins10%
after installation and connection
3–6 weeks from contract to opening
Forest, shore, slope, nature reserve. Ground screws are permitted everywhere.
- 1–2 daysInstalled in 1–2 days. No concrete or earthworks.
- No heavy machineryNo access for cranes or concrete mixers required. A crew of 4–6 people.
- Protected areasPermitted where concrete foundations are not. Discuss your specific location during a consultation.
- Any terrainSlopes, forests, shores and uneven sites without levelling.

Three models:
the most popular choices
for hotels
Four scenarios,
but one product
A structure you can trust
for intensive use
- StructureGalvanised steel panels. No settling. Seismic and fire resistant.
- Energy efficiencyClass A. Wall insulation equivalent to 45 cm of brickwork.
- Structural warranty25 years of manufacturer responsibility stated in the contract.
- Repeat assemblyUp to 10 full assembly and disassembly cycles without
loss of structural properties. - Ground screwsInstallation on slopes, in the field and in protected areas. No earthworks.
- Envelope airtightnessProtection from temperature fluctuations and humidity. A stable indoor climate.
Certificates and warranties
- TÜV ThüringenWPQR №26-372195February 2026
- NDIBKReport No. 221-323/023/26April 2026
- Environmental safetyMaterials certificateMay 2025
- Warranty25 years on the structurein the contract
Questions before starting your project
Can a HOMERS development be launched in stages?
A phased launch can be included in the project. First, establish the overall site layout, utilities and access routes so later stages do not disrupt the operation of the first homes.
Which homes should I choose for a hotel?
The choice depends on capacity, the type of stay and guests’ expectations. Compare HOMERS models by layout, privacy, terrace and maintenance needs.
What should I consider before opening for the season?
Agree on the design, site preparation, production, logistics, installation, connections and fit-out. The readiness date is determined using the complete schedule. Learn more about the production stages.
What return can a HOMERS hotel project generate?
There is no single figure for every location. You need to calculate room rates, occupancy, seasonality and management and maintenance costs. Revenue scenarios should be assessed before investing.
How can I request a proposal for a development?
Send the location, site plan, approximate number of homes, intended guest format and preferred launch stages. The HOMERS team will help you work through the specification, budget and schedule.
Can solar panels and access control be added?
Additional integrations can be included after reviewing the development’s needs and available infrastructure. Capacity, storage and access arrangements are selected for actual loads, and their cost is agreed separately.
Ready to calculate
your project?
- Or message us directly
Serhii Zelenyi +380 99 341 22 24










